<em id="n5sze"></em>
    <em id="n5sze"></em>
        <sub id="n5sze"></sub>

            中文版 | English
             
            服務 Ignition
            服務 Wall wiper
            服務 Wood base
            服務 Winch rope
            服務 Kom rotator
            服務 Wheel packing
            服務 Drilling steel
            服務 Rotation pole
            服務 Conservation rubber
            服務 Liquid-gas separator
            服務 Hydraulic winch
            服務 Vacuum degasser
            服務 Blowout preventer
              Wo Hing Petroleum ... 2011/4/1 
              Wo Hing Petroleum ... 2011/4/1 
              Wo Hing Petroleum ... 2011/4/1 
              Wo Hing Petroleum ... 2011/4/1 
              Wo Hing Petroleum ... 2011/4/1 
              Wo Hing Petroleum ... 2011/3/31 
              Wo Hing Petroleum ... 2011/3/31 
            Name: Langfang HeXing Petroeum Equipment
            Add: in the eastern ring road oil base village
            Tel: 15810047588
            Fax: 0317---2558811
            Mail: hx060718@yahoo.cn
            Product: staff@hexing.net.cn
            Location: Home >> Message details
              Vacuum degasser

               點擊圖片放大 

               詳細介紹
            I、General description
            HZCQ240F-A Vacuum Degasser is a kind of specialized equipment on  handling the gassing drill-mud. It is a new type degasser. We developed it on  the basis of studying various kinds of degasser at home and abroad. It applies  in the complete sets of mud purify system. It can recover the mud viscosity property and reduce the drilling cost. At the same time,  it can also act as the  high-power mixer if there is not gas in the mud.
             
            II 、Main performance parameters
            1、capacity:  4m3/min
            2、vacuum: 300-600mm/hg
            3、motor  power:15kw
            4、pump  power: 3kw
            5、motor  speed:1460r/min
            6、pump  speed:1420r/min
            7、weight:  1200kg
            8、size:2500×1000×1540
            9、standard:SY/T5612-2007
            Ⅲ、structure
            Structure of HZCQ240F-A Vacuum Degasser, Construction principle of the HZCQ240F-A Vacuum Degasser as shown

            1、排氣管道2、溢流管3、吸氣管道4、主電機5、皮帶護罩6、殼體7、真空表8、放氣閥門9、葉輪總成10、放液口蝶閥11、排液口彎頭12、水環式真空泵13、連通管道14、水箱15、水箱非氣接頭16、水箱進水接頭17、上水由壬18、上水管19、底座
            HZCQ240F-A Vacuum Degasser is mainly made up of Vacuum tank shell,Impeller assembly,main motor,belt roller,belts,belt guard, water ring vacuum pumps and motors, water tanks,associated line,suction pipe line,drain tube ,drain butterfly valves, drain elbow,base, vacuum clock, electric apparatus component and so on . Water Ring Vacuum Pump and the composition of the pipeline pumping system, pump tank gas,drain the pipeline pumping gas.Bearing assembly is specialize in designing air-cooled heat bearings for Bearing base outside the welding heat sink,under the belt roller the fan installation is order to air -cooled bearings. Bearing operation generate of the heat by fan cooling.The main motor of the elastic belt, can adjust the motor base on top of the wire to complete.
            HZCQ240F-A Vacuum Degasser is of compact structure, modeling novel, it is convenient for installation, using and maintenance in the field location.
             
            Ⅳ、Operating  principle
            HZCQ240F-A degasser is the vacuum degasser.  It utilizes the  pumping action of vacuum pump. It causes the negative pressure area in the vacuum tank. The mud is acted by the atmosphere pressure and enter into the rotor hollow shaft through the suction pipe, then is jetted and threw to the tank wall. As the action of the collide and foam separator, the foam in the mud is broken and the gas is escaped, the mud is pumped and drained to the safe area by the vacuum pump. Because of dead weight, the mud enter into the drain room and is drained out the tank by the rotor.
             
            Ⅴ、Installation & Operation
            1、When installing the degasser should have no the obvious inclination .
            2、When running , the drainage pipe end and suction pipe end should be synchronously dip into the mud , otherwise, the degasser will not work.
            3、 Before running, first , the outside ø16 gum pipe of vacuum pump should link with water source, and water to the oil & gas separator until the fluid drained from the overflow.
            4、 When startup , should be first fit the vacuum pump switch about 2 minutes, then fit the main motor switch and view the motor rotation , the correct rotation can be found by an arrow on the tank and pump .
            5、 The outside ø16 gum pipe of vacuum pump should link with water source.
            6、The drain hose should be self-provided by user.
             
            VI、Maintenance
            1、The coping of the vacuum tank should be cleaning each week, in order to prevent the sundries from jamming the air passage. They are cleaned with water. They are the air collector and the foam separator on the coping.
            While flushing, disconnect the vacuum line, offload the screw plug and meter-seat , the high pressure line should to be inserted into the vacuum tank and flushing 3-5 minutes at a time . After flushing, drain out the tank water. Fix the take-down accessories, assembly can be proceeded as the opposite sequence of disassembly.
            2、After completing, should flush the vacuum tank rotor and suction pipe. Switch off the power , unload the viewport jam plank( namely the square flange board), check the parts whether it has no worn or damage , and clean the inside eyewinker, flush the tank wall and rotor with the high pressure water line.
            3、The above-mentioned job should be done after using each time, and append 1 litre engine oil into the vacuum pump , and revolve 1-2 minutes in order to lubricate and defend against rust on the vacuum pump vane and inside surface , keep it normal usage again.
            4、If the work environment temperature is higher than 30℃, must view the vacuum meter at any time . If the vacuum is lower than 0.03MPa, should replace water in the gas & water separator on time , keep the water temperature is not over 70℃ .
            5、The calcium-base grease should be appended into the vacuum pump bearing pedestal and vacuum tank principal bearing every 7 work days until they are full.
            6、After using in winter, must drain water of the gas & water separator and pump , preventing them from frozen .
            Add to Favorites| Home |Contact
            All rights reserved:Langfang HeXing Petroeum Equipment Add:in the eastern ring road oil base village
            Tel:15810047588 Fax:0317---2558811
            Technical Support:Hao Lian Wang Luo
            国产黄色大片在线观看